S/NPROJECT NAMECLIENTPROJECT YEAR
1Procurement of Emergency Stop Switch (Hooks & Capstans) OEM: Harbour & Marine Engine - NLNG Train 7 Project. NLNG2021
2Procurement of Well Point Accessories (Hose & Hose Fittings) for NLNG Train 7 Project DAEWOO Nigeria Ltd.2021
3Supply of HDPE Pipes & Fittings for Drinking Water P. O. No.: 81087221 UNICEF Sierra Leone2020
4Supply of HDPE Pipes & Fittings for Drinking Water P. O. No.: 81086025 UNICEF Sierra Leone2020
5Procurement of PSL 2 Seamless Pipes Shell Gbaran Phase 3A Enwhe Project DAEWOO Nigeria Ltd.2020
6Procurement of Stainless Steel & Carbon Steel Pipes for Shell Gbaran Phase 3A Enwhe ProjectDAEWOO Nigeria Ltd.2020
7Procurement of Steel Structures for Shell Gbaran Phase 3A Enwhe Project DAEWOO Nigeria Ltd.2020
8Procurement of Pig Trap Pipes for Shell Gbaran Phase 3A Enwhe ProjectDAEWOO Nigeria Ltd.2020
9Procurement of Fittings for Shell Gbaran Phase 3A Enwhe Project DAEWOO Nigeria Ltd.2020
10Procurement of Ni-Cr Wire for Nigeria Indorama Fertilizer ProjectDAEWOO Nigeria Ltd.2020
11Procurement & Installation of 2,000 Meters of 150mm2 Aluminium conductor (ACSR).ABUJA ELECTRIC DISTRIBUTION COMPANY2020
12Procurement of GRP Pipe and Fittings for DANGOTE Fertilizer ProjectDANGOTE GROUP  2019
13Procurement & Installation of Fire Hose Bridge for DANGOTE Fertilizer ProjectDANGOTE GROUP 2019
14Procurement and Installation of Cathodic Protection System Shell Gbaran Phase 3A Enwhe ProjectDAEWOO Nigeria Ltd.2018
15Procurement of Electrical Installation Hardware for Nigeria Indorama Fertilizer ProjectDAEWOO Nigeria Ltd.2018
16Procurement of Heavy Duty Hammer Drill Packages for NLNG Revamp ProjectDAEWOO Nigeria Ltd.2018
17Procurement of 20ft x 8ft Export Grade Loft Container C/W DNV 2.7.1 Offshore Standard Requirement: 4 Leg Sling, 8 1/2 Ton Shackles, MPI & Load Test, Blasting and Painting (with 3 level coating), Conveyance of Pad eye to EN12079 Offshore Standard. DELTATEK OFFSHORE 2018
18Procurement & Installation of Inciner8 i8-140G - Diesel Fired General Waste Incinerator HAZCON Nigeria Ltd.2018
19Disposal of Hazardous Production Chemicals from ADDAX Production Facility OML137 HAZCON Nigeria Ltd.2018
20Installation of 6’’ HDPE Underground Fire fighting pipeline for LNG station and Workshop, Kakau Village, Chikun LGA, Kaduna State.
21Spooling, Installation & Commissioning of 4 x 520m Spoolable Reinforced Composite Pipes for purified process water feeding unit at DIKKO -OLAM Integrated Farms facility -Kaduna State in compliance to specification. HAZCON Nigeria Ltd.2018
22Fabrication, Erection and Painting of Crude Storage Tank - Floating Roof; Contract No: Fac - 1997 - 0521 (Sub-Contract)HAZCON Nigeria Ltd.2017
23Call-Off Contract for Fabrication Services Contract NumberTB-2855 (Sub-Contract)HAZCON Nigeria Ltd.2017
24Procurement & Installation of RING MAIN UNIT for Lokoja distribution stationABUJA ELECTRIC DISTRIBUTION COPMPANY2017
25Procurement of Crane Turn-around Maintenance Spare Parts OEM: LOCATELLI NLNG
26Procurement of installation materials for Lokoja distribution station ABUJA ELECTRIC DISTRIBUTION COPMPANY2017
27Procurement of Substation Upgrade equipment of Bwari Substation IIABUJA ELECTRIC DISTRIBUTION COPMPANY2017
28Procurement of installation materials for 500kva Transformer at Lokogoma SubstationABUJA ELECTRIC DISTRIBUTION COPMPANY2017
29Procurement of Project 80 -100mm Dia. Amoured Copper Cable Cutter for Southern Swamp Associated Gas Solution DE - C (Shell) DESICON GROUP2017
30Procurement of Project Fluke Meters for Southern Swamp Associated Gas Solution DE - C (Shell)DESICON GROUP2017
31Procurement of Substation Upgrade equipment of Jiwa Sub SubstationABUJA ELECTRIC DISTRIBUTION COPMPANY2017
32Training of Pabod Brewery Industrial Safety personnel on the use of the installed FM 200 Fire Suppression Systems EMTECH Intl' Ltd.2017
33Installation Of 500mm PN16 Gate Valves and Hydrant Transition for Greenville LNG Underground Fire Fighting System covering LNG Train 1, 2 & 3.Greenville Oil & Gas2017
34Laying and Coupling OD500mm x 365 metres of HDPE pipe and Pressure testing of pipe sections before backfill for Greenville LNG Underground Fire Fighting System covering Train 3.Greenville Oil & Gas2017
35Installation of FM 200 Fire Suppression Systems and Training of Personnel at Pabod Brewery Upgrade – Port Harcourt. EMTECH Intl' Ltd.2017
36Laying and Coupling OD500mm x 320 metres and OD110mm x 200 metres of HDPE pipe and Pressure testing of pipe sections before backfill for Greenville LNG Underground Fire Fighting System covering Loading Bay SystemGreenville Oil & Gas2016
37Leasing of Salt Tester modules for Total Ofon D3 projectKAMHARI Energy Services Ltd.2016
38Laying and Coupling OD500mm x 900 metres of HDPE pipe and Pressure testing of pipe sections before backfill for Greenville LNG Underground Fire Fighting System covering Trains 1 & 2.Greenville Oil & Gas2015
39Welding and Coupling OD400mm x 1,512 metres of HDPE pipe and Pressure testing of pipe sections before backfill for LNG Plant Dewatering Pond. EARTHBASE Construction Ltd.2015
40The Procurement, installation and commissioning of Inergen and Deluge System at Total OML 058 Upgrade DARYCET Intl' Ltd. / TOTAL E&P2015
41Procurement of GRE Consumables at Total OML 58 Project.DARYCET Intl' Ltd. / TOTAL E&P2015
42Procurement of Pipe Flushing Chemicals and Flushing of pipes at Total OML 58 Project DARYCET Intl' Ltd. / TOTAL E&P2015
43Procurement of GRE Pipe Adhesive component at Total OML 58 ProjectDARYCET Intl' Ltd. / TOTAL E&P2015
44The Procurement and Installation of Fire hydrant standing barrel 6’’ x 4’’ equipped with: -n.1 Ball valve 4’’ level operated wafer type –n.2 Gate valve 4’’ NPT female , bronze body, gun metal connection 4’’ NPT male x 4’’ RTHM, complete of gun in gun metal material and stainless steel chain VENTARIUS Nigeria Ltd.2015
45Painting of GRE Pipes for Fire Fighting System at Total OML 58 Project. DARYCET Intl' Ltd. / TOTAL E&P 2015
46The Procurement, Installation and commissioning of fire fighting monitors with: Bronze Monitor mod. MSS65 FM approved, 3000mit, lever operated, inlet flange 4, ANSI150 FF, Outlet 2-1/2, NH-M as per DGA 1090045 Painting: RAL3000 as per project standard and Training of Fire Fighting Personnel. EARTHBASE Construction Ltd.2014